Friday, September 21, 2012

Tiling (Part 2)


The tiling of our new home is now completed.  The porch tiles are terracotta tiles and is bordered with black tiles.  Terracotta tiles were also used for the entrance landing and was tiled with small square orange tiles in between.  The hall was tiled with white tiles and the kitchen was tiled with grey tiles and small square orange tiles.  The kitchen wall at the back was tiled with white tile and trimmed with orange tiles.  These orange tiles were used throughout the house.

As for all the three bathrooms, we've chosen black and white tiles. The sales person who sold us the tiles, came up with the designs for each bathroom. For the shower area, we pebbled wash the shower area for all three bathrooms.

As we had balance tiles, we tiled our back lane as we built a outdoor sink with a RC slab.  This out door sink will be used when we are entertaining.

So here are some pictures for you to look at and sorry about the mess ~ will promise nice pictures once the house is cleaned.

Laying of Terracotta tiles at the porch
The almost completed Terracotta tiles at the porch
The tiler initially tiled the entrance landing with white tiles from the hall - sort of like a continuation
But we told the tiler to change it to Terracotta tiles and inserted with small square orange tiles
The master bathroom with white tiles inserted
The children's bathroom
The guest bathroom
The back yard / land cemented and getting ready for tiling


Monday, August 27, 2012

Tiling

On 25th August 2012, the house is now undergoing tiling.  We are tiling the driveway and patio with terracotta tiles.  The foyer, entrance and dining is tiled with white 2x2 tiles.  The kitchen and domestic helper's room is tiled with light grey 2x2 tiles.  All three bathrooms will be tiled with 1x2 black and white tiles.  White tiles on the bathroom walls and trimmed with black tiles.

Because we are on a tight budget, we hired Indonesian labourers instead of getting our Contractor to do the tiling for us.  We were advised that if we were to hire Indonesian labourers, we were taking a risk as they might not be very good.  However, luck is on our side as these batch of Indonesian labourers are good and they seem to know what they are doing.  Let's just say that we paid only half of what our Contractor wanted to charge us.  Cement and tiles are provided by us.

Part of the tiles that were delivered to our house
The Indonesian labourer cutting one of the tile
Indonesian labourers tiling the dining area
They work fast, within 10 minutes, they laid a number of tiles
More tiling going on
By evening, almost the dining and kitchen area are tiled







Windows

There are many types of windows in the market.  It all depends on how much you are willing to pay.  When we first did our research, there were windows that could keep the sound barrier out, windows that could keep out the dust, thin glass, frosted glass and so on.

In the end, we passed the project to our Contractor to handle and I must say that he did a good job.  The windows look classy and solid.

One of the window for the Master Bedroom
Window at the Kitchen
Windows for the M Floor



Thursday, August 23, 2012

Renovation Progress 6 : The Whole House

Our renovation has taken longer than expected.  It started in March 2012 and was suppose to take only about 4 months but it's now coming into the 6th month.  We must admit the contributor towards the delay in our renovation was not only the Contractor but us too.  The beginning of our renovation,  the contractor was slow, but later picked up the pace, then there were some decisions that I had to make, which I did but changed my mind again and again.
 
Anyways, as of todate, 21st August 2012, the plaster ceiling is almost completed, the main door and patio doors have been fixed.  The floors have been screed, inside and outside.  We've bought our tiles, our sanitary wares and our water heaters.  The windows too has been installed by our Contractor.

The main door and patio door has also been installed.  We had several challenges with installation of the main door.  It was  one challenge after another.  Normal hinges were not able to hold the 300kg door.  It has to be custom made.    Then the lock did not quite fit and that's still in modification mode.

Here we leave you guys with some of the Before and After pictures.  More to come.

Before : The façade
After : The façade is now squarish
After : Main entrance on left and patio entrance on the right
Roof Installation : Workers installing the new roof
Roof Installation : Workers installing the Roxul for the new roof
Before : Master bedroom
After : Master bedroom






Tuesday, July 3, 2012

Renovation Progress : Whole House

The house is now looking more like a home.  I am so bad at visualising but with the renovation progress going on now, I am able to see it more clearly.

So this post will mostly be picture blogging.

Breaking the terazzo tiles at the Hall area
The wooden door frame at the Patio area
The Facade of our new home
The master bedroom's Bathroom
The Boyz' Room
The shared Bathroom between the Boyz' and Girl's room
The Girl's room
The Master Bedroom - view from inside looking out
The new Roof - view from the Master Bedroom


Updates on Main Door

LOL ... I know it's getting a little bit old, harping on the main door.  However I have to give you guys a little update on what's happening.  Well ..., we've made the frame and sent it to the new house.  When our contractor's carpenter wanted to lock it down, he found that the corners are not all that straight or aligned. 

If we were to leave it as it is, we would have a main door with a gap at the top and that the door will not lock properly.  Being that this was a main door, we did not want such scenarios.  So Hubby had to take this heavy frame down and re-do it, (it took 4 people to carry it out and lay it on the ground).  Dismantling the frame was no easy task.  He had to knock it out and cut the wood slightly to fit 90 degrees.

Knowing that the reward is that we've put our heart into making something for our HOME is priceless.

Hubby dismantling the door frame to rectify
Hubby knocking the wooden frame out to rectify
Cutting inches off the wooden frame with the machine (on loan from brother-in-law)
The little laser gadgets that tells if your frame is aligned
The wooden door frame that took 4 men carry
  
  

Tuesday, June 12, 2012

Renovation Progress - Patio & Room Doors

All our weekends have been dedicated to sanding down the patio and room doors.  We bought another 3 doors from a lumber yard in Klang.  Apparently these doors were from a KTM (Keretapi Tanah Melayu - Malaysian Railway) office.  It's solid, heavy and a unique in design.

The sanding down was done by machine while the edges had to be done by hand by sand paper.

The Patio doors were white on the outside and brown on the inside.
So we had to sand down both sides.
Two of the three room doors which we bought from the lumber yard.
Before and after the doors were sand down
A close up of the doors